At Bode Equipment, we know that unexpected downtime and costly service calls can cause problems for even the most efficient material handling operation. To help reduce the impact of these events, we offer Preventative Maintenance Agreements for all customers in the New England area.

Maintenance on Your Schedule

Depending on your schedule, equipment use and type and the needs of your operation, the team at Bode can provide preventative service calls on a quarterly, semi-annual or annual basis. We will look at your busy season and scheduled shutdowns to plan your service calls to help ensure that your prime operations are not interrupted by the service your equipment needs.

Don’t Let “Wear and Tear” Impact Your Operation

Our goal is keeping your equipment performing as expected. Our Preventative Maintenance team will identify parts and equipment that show signs of wear prior to equipment failure. In the event that parts are needed during our inspections, we will work with your personnel to schedule a return call at your convenience or ship the parts directly to your facility for safeguarding until they are needed for installation.

With our Preventative Maintenence plans, your facility can remain operational with minimal downtime from your equipment.

Overview

We offer Preventative Maintenance Agreements for all of our customers throughout New England.

Our team is qualified to provide scheduled maintenance on all makes and models of:

  • Overhead Sectional Doors
  • High Speed Roll Up Doors
  • Steel Roll Up Doors
  • Impact Swing Doors
  • Loading Dock Levelers
  • Elevating Docks
  • In-plant Scissor Lifts
  • In-plant Tilters
  • Stackers
  • Overhead Cranes
  • Mezzanine Gates
  • Truck Ramps
  • Floor-to-Floor Lifts (VRC)
  • Box Lifts/Shuttles
  • Conveyors
  • Outdoor Fence Sliding Gates
  • Barrier Arms

“Over my 22 years of work in this industry, this is one of the best projects I’ve had the pleasure of be involved in. The constant communication and the desire to keep us informed throughout the entire process along with the flexibility to accommodate change orders while still keeping our project on schedule is why I wouldn’t hesitate to hire Bode again and again.”

Doug Devers
Warehouse Operations Leader, Hypertherm

“I’ve worked with Bode on numerous projects over the years and I can honestly say they have never told me they couldn’t handle a job.”

Project Engineer
Coca Cola of New England

“Our experience with Bode Equipment Company is that they are a professional, responsive and well managed firm that has always met or exceeded our expectations.”

Mark A. Carroll
VP Manufacturing

“Over the past several years we’ve called on Bode not only for installation and design projects, but also for preventative and corrective maintenance services.”

Supervisor of PSNH

“Bode presented a professional bid that encompassed everything we needed to complete the loading docks for the new facility…Their ability to provide a total solution, combined with their extensive experience and reasonable prices, made them the obvious choice for the job”

Paul Kelley
Sullivan Construction Superintendent

“Time and again Bode proves itself to be a soup-to-nuts first class company…We couldn’t be happier with the solutions Wildeck and Bode provided.”

Gerry Couture
General Manager, Baker Distributing

“The Bode team met every deadline and provided excellent service and product. We’re very pleased with the result and have already contracted with them for another project at one of our Massachusetts locations.”

Ryan Denver
Vice President and Chief of Operations

“From design and fabrication to installation, Bode provided everything we needed to make this transition a success. I know that when it comes to quality service, quick response and attention to detail I can always count on Bode.”

Doug Devers
Warehouse Operations Leader, Hypertherm

“Bode has an excellent reputation in the power sports industry. They were the logical choice for the project. The Bode team was great at keeping us up to date on the project, anticipating potential issues and resolving them proactively. They always made me feel confident that the project would be done right, on time and on budget.”

John Lyon
General Manager – Co-Owner

“The communication and coordination on this project was outstanding. The Bode team not only provided regular updates on the progress of each install, they worked in such a professional and unobtrusive manner, never impeding the day-to-day work in any of our facilities. I have complete confidence in the knowledge and abilities of the Bode team. For anything material handling or warehouse related, Bode is where I go.”

Blair Gourley
Director of Facilities

“From the very beginning of the project, I was impressed by the Bode team…The president of the company himself came out to the project site to assess what was needed and put together an installation plan that fit seamlessly within the overall scope of construction.”

Paul Kelley
Sullivan Construction Superintendent

“We appreciated Mike’s candor and responsiveness throughout the entire process. The entire Bode team was very honest and did great work with no surprises. I would happily work with them again.”

Marc Wulfraat
MWPVL International

“The success of the garage door project was key to our decision to engage Bode for this more complex installation.”

Kathy Solomon
The First Church of Christ, Scientist

“I can’t say enough about the responsiveness and consistent attention to quality from everyone at Bode”

Kathy Solomon
The First Church of Christ, Scientist

“PSNH has enjoyed a long and productive relationship with Bode Equipment”

Supervisor of PSNH

“I’ve worked with Bode on numerous projects over the years and I can honestly say they have never told me they couldn’t handle a job.”

Project Engineer
Coca Cola of New England

“When it came to accommodating this consolidation, Bode was at the top of my list.”

Project Engineer
Coca Cola of New England

Our Clients

2019-01-02T13:48:35+00:00